Lane Creek Drilling Survey
Proponent requesting to drill 5 holes 8" in diameter to depths of 15-50 feet to survey the location of bedrock to best determine stream channel design for culvert upgrade at Lane Creek and Highway 244.
Project Summary
Location Summary:
Project site is within Lane Creek Campground between the right loop and Lane Creek proper off of Highway 244 east of the city of Ukiah, OR.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 06/10/2025 |
| Decision | 09/2025 (Estimated) |
| Implementation | 10/2030 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
Usgs 9.5(G)
Special Authority:
Not Applicable / Other
Lead Management Unit:
North Fork John Day Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Lane Creek Drilling Survey
Decision Signed Date: 09/10/2025
Forests:
Umatilla National Forest
Districts:
North Fork John Day Ranger District
States:
Oregon
Counties:
Umatilla
Legal Land Description:
T. 5S., R. 32E., NW/SE of Sec 30
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Kiyoshi Fujishin
P.O. Box 158
Ukiah, OR 97880
509-522-6277
kiyoshi.fujisin@usda.gov
Last Updated: 9/15/2025