Skip to main content

Frady Branch/Leatherwood Creek Loop Reroute

The purpose of this project is to redirect the trail to a sustainable grade and condition-avoiding the area where the trail bridge was washed out during the heavy rain event of September 2009.

Project Summary

Last Updated: 12/10/2019