TVA Structure 16
TVA proposes to replace existing structure 16 of Apalachia Hydro Plant transmission line with a 10 ft. taller pole in order to raise the conductors further from the ground. An existing access road would be utilized to access the site.
Project Summary
Location Summary:
Off NFSR 23
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 11/01/2017 |
Decision | 07/2018 (Estimated) |
Implementation | 02/2018 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Ocoee - Hiwassee Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
TVA Structure 16
Decision Signed Date: 07/25/2018
Forests:
Cherokee National Forest
Districts:
Ocoee - Hiwassee Ranger District
States:
Tennessee
Counties:
Polk
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Terinda Whisenant
3171 Hwy. 64
Benton, TN 37307
423-338-3300
fs-comments-southern-cherokee-ocoee-hiwassee@fs.fed.us