Skip to main content

AT&T Mobility Communication Site

ATT proposes to install an 8%u2019x8%u2019 equipment cabinet on an existing concrete foundation, 20kw AC generator, H-Frame with meter and disconnect, and underground copper grounding wire and antenna installation on an existing tower structure.

Project Summary

Last Updated: 3/19/2020