Skip to main content

AT&T Fiber Cable Installation

AT&T would like to place approximately 11.3 KF of fiber cable and six 30%u201Dx48%u201Dx36%u201D hand holes in the ROW and under the gravel roadway of Fairview Rd from existing HH feeding the Verizon tower at 831 Fairview Rd to a new AT&T tower.

Project Summary

Last Updated: 3/19/2020