AT&T Hwy 30 Utilities Project
Install approximately 13,000 feet of fiber optic line aerially on existing power poles along Hwy 30 and across the Hiwassee River and subsurface in existing conduit line along Hambright Road. Install two hand holes at river crossing.
Project Summary
Location Summary:
Approximately seven miles south of Etowah, TN. Part of the project is adjacent to state hwy 30 and part of the project is adjacent to Hambright Rd.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 01/21/2021 |
Decision | 03/2021 (Estimated) |
Implementation | 04/2021 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Ocoee - Hiwassee Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
AT&T Hwy 30 Utilities Project
Decision Signed Date: 03/24/2021
Forests:
Cherokee National Forest
Districts:
Ocoee - Hiwassee Ranger District
States:
Tennessee
Counties:
Polk
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Terinda Whisenant
3171 Hwy. 64
Benton, TN 37307
(423) 338-3300
tewhisenant@fs.fed.us
Last Updated: 4/6/2021