Skip to main content

Sugarloaf Drive Utility Corridor Project

The project establishes a utility corridor 20 feet on either side of the 1.3 mile Sugar Loaf Drive. The corridor would be 6.3 acres in area. Water and fiber optic would be installed subsurface and electric aerially.

Project Summary

Last Updated: 2/16/2022