Skip to main content

Utility ROW Along CR 3420

Installation of a natural gas and saltwater disposal pipeline, designation of a 50ft - wide utility corridor x 2,034 ft - length. During installation width would be 75ft with 25 ft restored after installation.

Project Summary

Last Updated: 5/5/2025