Skip to main content

CE 2026 Penelec Utility Pole Replacement

Penelec proposes to abandon the underground line that runs parallel to SR346 (West Washington St) and install utility poles along the roadway to support both Penelec and Verizon lines. Additionally, Penelec proposes to relocate two poles currently located at the end of FR137 closer to the roadway.

Project Summary

Last Updated: 8/21/2026