Skip to main content

Catalyst Lot 475 Pipeline Special Use Proposal

Catalyst Energy Inc. has proposed the development of a new pipeline following along FR 169 within Pleasant Township, Warren County. The proposed Right of Way is approximately 2,000 feet in length by 15 feet wide, totaling about a 1 acre clearing.

Project Summary

Last Updated: 6/15/2012