Skip to main content

Columbia Gas Pipeline Special Use Permit Renewal

SUP Renewal of Rights of Way (ROW) for 2 existing natural gas pipelines located within Warren County, Pennsylvania. Includes widening of a 15 ft. ROW to a 30 ft. ROW over 6,687 ft. for one of 2the two SUP renewals.

Project Summary

Last Updated: 3/26/2013