Skip to main content

Potomac Area Access Trails Project

Proposal to incorporate existing social climber access trails as system trails at Seneca Rocks (1.17 mi), Guide Walls (0.13 mi), and Reeds Creek (0.27 mi). Reroutes of the Landis Trail (approx. 4.31 miles; 5 reroutes). Creation of the new Roy Gap Trail (0.17 miles). Estimated decision: June 2026

Project Summary

Last Updated: 3/6/2026