Skip to main content

Forest Road 244 Bridge Stabilization

This project proposes to repair flood damage to the bridge on FR244 crossing a tributary to Red Run. The abutment is eroding and would be repaired by drilling a dowel into bedrock and casting concrete to protect the footing from further undermining.

Project Summary

Last Updated: 8/4/2021