Skip to main content

Lake Sherwood Road Stream Bank Stabilization

This project is needed to stabilize the streambank and protect road infrastructure leading to Lake Sherwood from damage caused by flooding events in Meadow Creek.

Project Summary

Last Updated: 6/28/2024