Forest Road 8100 Bridge Replacement South Branch Presque Isle River Project
The bridge on FR8100 spanning the South Branch Presque Isle River WSR has deteriorated with time and currently is posted for reduced load limits. This project proposes to replace the existing bridge with a new one.
Project Summary
Location Summary:
Bessemer District
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 03/01/2018 |
| Decision | 10/2018 (Estimated) |
| Implementation | 09/2019 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (18), 36 Cfr 220.6(E)(18)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Bessemer Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Road Management
Project Activity:
Road Maintenance; Road Improvements/Construction
Current Status:
Completed
Project Decision Information
Forest Road 8100 Bridge Replacement South Branch Presque Isle River Project
Decision Signed Date: 10/23/2018
Forests:
Ottawa National Forest
Districts:
Bessemer Ranger District
States:
Michigan
Counties:
Gogebic
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Michael Bigelow
E6248 US 248 US Hwy 2
Ironwood, MI 49938
906-358-4057
mbigelow@fs.fed.us
Last Updated: 10/24/2018