Skip to main content

Forest Road 3470 Mile Post 5.23 Bridge Replacement

The FR3470 MP 5.23 Bridge spanning the South Branch Paint River has deteriorated with time, and currently is posted for reduced load limits.

Project Summary

Last Updated: 6/30/2021