Skip to main content

SHT Crow Creek Re-route

The Crow Creek bridge on the Superior Hiking Trail (SHT) needs to be replaced. The current bridge has a span of approximately 50 feet. By rerouting the SHT by 250 ft a smaller bridge spanning only 30 feet could be utilized to cross Crow Creek.

Project Summary

Last Updated: 3/23/2017