Skip to main content

HHH Mining Plan of Operations

Year round suction dredging in Palmer Creek with two (2) six inch suction dredges, high-banking on the bench above Palmer Creek, and use of two temporary tent camps. Access will be by snowmobile or ATV on existing trails.

Project Summary

Last Updated: 9/26/2014