Skip to main content

Alaska Railroad special use permit renewal for flood control berm

Re-issue permit for the construction, operation, and maintenance of a flood control berm of approximately 2500 feet long, 12 feet wide, and 10 feet high upstream of the railroad embankment at Mile 36 on Trail Creek.

Project Summary

Last Updated: 3/11/2014