Skip to main content

Resurrection Creek Aquatic Habitat Maintenance

Restore flow into a constructed side channel by removing accumulated debris/sediment deposited during a 2012 ice dam break flood event. Improve grade control and excavate an additional inlet reducing potential dewatering from future flood events.

Project Summary

Last Updated: 7/25/2014