Cooper Creek Ground Water well(s) installation
Through well points, collect at least two types of data: hydraulic conductivity measurements and groundwater-level measurements in a proposed future restoration project and in the vicinity of a proposed new channel.
Project Summary
Location Summary:
Southeast side of Cooper Creek between the Kenai River and start of canyon reach approximately 0.75 miles upstream.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 02/20/2015 |
Decision | 05/2015 (Estimated) |
Implementation | 06/2015 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.11, 7 Cfr 1B.3(A) (3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Seward Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Watershed Management
Project Activity:
Watershed Improvements
Current Status:
Completed
Project Decision Information
Letter to File: Cooper Creek Ground Water well(s) installation
Decision Signed Date: 05/14/2015
Forests:
Chugach National Forest
Districts:
Seward Ranger District
States:
Alaska
Counties:
Kenai Peninsula
Legal Land Description:
Township 05N, Range 03W, section 34
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
John Lang
334 4th Avenue
Seward, AK 99664
907-288-7719
jslang@fs.fed.us
Last Updated: 3/9/2017