Skip to main content

Little Camas Placer Exploration

Operator will be sampling 11 sites; remove 1-2 cubic yds of material, process and return sample materials to the hole and cover w/top soil. A rubber tired backhoe will be used to excavate the samples & use a wash plant capable of sampling 4-5 yds/day

Project Summary

Last Updated: 7/30/2012