Gold Heart Placer (2024 Plan of Operations)
Proposed 2024 Plan of Operations for valuable mineral activities on National Forest land in the Washington Creek drainage. Operator to utilize a mini-excavator to expose bedrock in an 80 foot by 80 foot area of interest. Access via existing roads.
Project Summary
Location Summary:
Washington Creek drainage, National Forest system lands, in Powell County, Montana.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 07/16/2024 |
Decision | 08/2024 (Estimated) |
Implementation | 09/2024 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (8), 36 Cfr 220.6(E)(8)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Lewis And Clark National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations
Current Status:
Completed
Project Decision Information
Gold Heart Placer (2024 Plan of Operations)
Decision Signed Date: 08/29/2024
Forests:
Lewis And Clark National Forest
Districts:
Lincoln Ranger District
States:
Montana
Counties:
Powell
Legal Land Description:
S/El/4sec. 7, Tl2N, R8W, P.M.M, in Powell County, MT
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
James Yarbrough
2880 Skyway Drive
Helena, MT 59601
406-683-3859
james.yarbrough@usda.gov
Last Updated: 9/5/2024