Skip to main content

Heede Pasture Water Improvement Project

The proposed action is to install a gravity fed water pipeline from the range improvement pond to the Hoot Owl Cow Camp corral for approximately 2,000 feet. The pipe will be a High Density Polyethylene commonly used for this purpose.

Project Summary

Last Updated: 7/22/2015