Vidler Tunnel Phase 2 Pipeline Replacement
In-kind replacement of 3,216 linear feet of existing, aboveground pipeline used to capture and convey water to the western portal of the Vidler Tunnel in the Peru Creek drainage for municipal drinking water.
Project Summary
Current Status:
Completed
Location Summary:
West portal of the Vidler Tunnel located below Argentine Pass in the Peru Creek Basin.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 03/24/2021 |
| Decision | 07/2021 (Estimated) |
| Implementation | 08/2021 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
White River National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Project Decision Information
Vidler Tunnel Pipeline ReConstruction and Replacement
Decision Signed Date: 07/28/2021
Forests:
White River National Forest
Districts:
East Zone/Dillon Ranger District
States:
Colorado
Counties:
Summit
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Anna Bengtson
900 Grand Avenue
Glenwood Springs, CO 81601
970-262-3454
anna.p.bengtson@usda.gov
Last Updated: 7/29/2021