Mountain Comm #SOP371 Sunlight Peak Powerline Line Burial
This project will replace the existing overhead power line supply with a buried power supply. A buried conduit and line system will be installed from the existing power pole to facilities operate under Sunlight Peak Communications Site Lease #SOP371.
Project Summary
Location Summary:
Top of designated communications site on Sunlight Peak in Garfield Co.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 05/25/2021 |
| Decision | 10/2021 (Estimated) |
| Implementation | 10/2021 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
West Zone/Aspen Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Cancelled
Forests:
White River National Forest
Districts:
West Zone/Aspen Ranger District
States:
Colorado
Counties:
Garfield
Legal Land Description:
SW 1/4 Sec. 19, T.7 S., R. 89 W., 6th PM, Garfield Co.; Sunlight Peak Designated Communications Site.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Michael Braudis
620 Main Street
Carbondale, CO 81623
970-262-3481
michael.braudis@usda.gov
Last Updated: 11/2/2021