Skip to main content

Butler Creek BDA Project

The project would utilize untreated wood posts and on-site materials to build multiple beaver dam analogs (BDAs). These temporary structures would be constructed by hand and would mimic the influence of beaver dams on the stream and riparian area.

Project Summary

Last Updated: 6/16/2023