Skip to main content

PSCo Keystone Resort Steel Main Gasline Reinforcement

Amending the existing PSCo permit#DIL462 to add 1,500 ft of existing gas line that was inadvertently deleted in 2001. In addition, a 6 inch steel main gas line would be installed to reinforce the existing line on approx.1500 ft of National Forest.

Project Summary

Last Updated: 10/8/2024