Skip to main content

CalTrans SH2 - regrading and removal of overhanging unstable thick soil mantle

CalTrans SH2 - regrade and remove overhanging unstable thick soil mantle. A soldier-pile debris catchment wall is proposed at the toe of the regraded slope. The proposed wall will catch the hazard falling material and prevent blockage of SH2.

Project Summary

Last Updated: 6/7/2016