Skip to main content

Littlerock Reservoir Sediment Removal Project

The US Dept. of Agriculture, Forest Service, and the Palmdale Water District are seeking public comment on a draft environmental review document. The document considers a proposal by PWD to build a concrete grade control structure to reduce future sedimentation, to haul approx. 1.2 million cubic yards of sediment from the reservoir to a disposal facility near Palmdale, and to maintain the water storage capacity at the Reservoir through annual removal of sediment. Please see the links below for the environmental document.

Project Summary

Last Updated: 7/18/2017