Skip to main content

High Bar Placer Mine Phase 2

To develop a portion of the High Bar #1 Placer Mine in the McNeal Creek drainage to remove gold bearing placer deposits. Mining will consist of surface excavation of approximately 45,000 cubic yards of material on-site on less than 4 acres.

Project Summary

Last Updated: 2/1/2012