Skip to main content

George Water Transmission Pipeline Special Use Permit Renewal

Special use permit renewal authorizing the maintenance and operation of an existing water transmission pipeline. No new disturbance will take place as a result of this renewal. NCRWQCB waiver category exempt.

Project Summary

Last Updated: 9/29/2014