Hancock Forest Management Access Road
Reconstruct 2,300 ft of temporary roadbed; fully construct a 200-300 ft adjoining spur roadbed. Road will provide temp access/use of private forest land for log hauling. Roadbeds to be blocked and grated after use. Located in OR, CA Water Board N/A.
Project Summary
Location Summary:
Located in Oregon, about 7 miles northwest of Hilt, CA. In Mill Creek 7th Field Watershed (HUC#18010208050202).
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 10/18/2016 |
Comment Period | 12/12/2017 |
Objection Period Start | 07/06/2018 |
Decision | 11/2018 (Estimated) |
Implementation | 11/2018 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Happy Camp Ranger District
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations; Road Improvements/Construction
Current Status:
Completed
Project Decision Information
Hancock Forest Management Access Road
Decision Signed Date: 11/20/2018
Forests:
Klamath National Forest
Districts:
Happy Camp Ranger District
States:
Oregon
Counties:
Jackson
Legal Land Description:
T40S, R1E, Section 28, Willamette Meridian.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Alonzo Jackson
63822 Highway 96
Happy Camp, CA 96039
530-493-1735
alonzojackson@fs.fed.us
Last Updated: 11/21/2018