Pacific Power & Light Company Water Transmission Pipeline Special Use Permit Renewal
Special use permit renewal authorizing the maintenance and operation of two existing water transmission pipeline for ten years until December 31, 2024. No new disturbance will take place as a result of this renewal. NCRWQCB waiver category exempt.
Project Summary
Location Summary:
Cold Spring and Frank Woods Spring on the Goosenest Ranger District.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 08/05/2014 |
Decision | 10/2014 (Estimated) |
Implementation | 10/2014 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (15)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Goosenest Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
PacifiCorp Water Transmission Pipelines Special Use Permit
Decision Signed Date: 10/20/2014
Forests:
Klamath National Forest
Districts:
Goosenest Ranger District
States:
California
Counties:
Siskiyou
Legal Land Description:
Section 1, T47N, R4W, and Section 4, T47N, R3W, Mt. Diablo Meridian
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Gay Baxter
37805 Highway 97
Macdoel, CA 96058
530-468-1210
gbaxter@fs.fed.us
Last Updated: 11/5/2015