Mark Wisniski Water Line Existing SUP Reauthorization
Operating, maintaining a water system right of way of min. essential width 4 ft, approx. 2,000 ft. long. Water system consists of a 300 gal. plastic water tank, 2,000 ft. of 2 inch plastic pipeline to private property for domestic use. RWB Waiver N/A
Project Summary
Location Summary:
Independence Road
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 01/26/2017 |
Decision | 07/2017 (Estimated) |
Implementation | 07/2017 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (15)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Klamath National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Cancelled
Forests:
Klamath National Forest
Districts:
Happy Camp Ranger District
States:
California
Counties:
Siskiyou
Legal Land Description:
Township 15 North, Range 7 East, Section 29 Humboldt Principal Meridian
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Alonzo Jackson
1711 S. Main Street
Yreka, CA 96097-9549
530-493-1735
alonzojackson@fs.fed.us
Last Updated: 9/29/2017