Arrowhead Core Drilling
Plan of Operations to core drill 10 sites on 3 mining claims. Drill sites: 10'x10' with a sump area 5'x5' at 4'. Holes: 4-6" in diameter, less than 150' deep; filled with concrete slurry at the end of drilling. Waterboard Waiver B.
Project Summary
Location Summary:
Project is located NE of Happy Camp, CA. Indian Creek Headwaters 7th field watershed.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 05/11/2023 |
Decision | 03/2024 (Estimated) |
Implementation | 06/2024 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (8), 36 Cfr 220.6(E)(8)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Happy Camp Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations
Current Status:
Completed
Project Decision Information
Arrowhead Core Drilling
Decision Signed Date: 03/27/2024
Forests:
Klamath National Forest
Districts:
Happy Camp Ranger District
States:
California
Counties:
Siskiyou
Legal Land Description:
T19N R6E Sec. 35 and 36. T18N R6E Sec. 2 and 3. Humboldt Meridian.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Alonzo Jackson
63822 Highway 96
Happy Camp, CA 96039
530-598-4157
alonzo.jackson@usda.gov
Last Updated: 3/27/2024