Reliable Power Project
Vegetation management, along power transmission lines operated by Hetch Hetchy Water and Power, to meet North American Electric Reliability Corporation (NERC) standards and improve the reliability of the power transmission system.
Project Summary
Location Summary:
Transmission lines from Early Intake and Holm Power Plants to Moccasin
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 06/2017 (Estimated) |
| Comment Period | 09/2017 (Estimated) |
| Objection Period Start | 06/2017 (Estimated) |
| Decision | 12/2017 (Estimated) |
| Implementation | 12/2017 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Groveland Ranger District
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Special Use Management
Project Activity:
Electric Transmission
Current Status:
Cancelled
Forests:
Stanislaus National Forest
Districts:
Groveland Ranger District
States:
California
Counties:
Tuolumne
Legal Land Description:
T1S R16-18E
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Michael Jow
24545 Highway 120
Groveland, CA 95321
209-962-7825 x 529
mjow@fs.fed.us
Last Updated: 3/29/2019