Skip to main content

SFPUC Intake Switchyard Hazard Mitigation Project Special Use Permit

Issuance of a Special Use Permit for installation and maintenance of a slope stabilization structure on less than 1/4 acre of National Forest System land outside the 1913 Raker Act right-of way up directly upslope from the Intake Switchyard facility.

Project Summary

Last Updated: 11/2/2018