Road 25 Riprap Removal
Enhance fish rearing habitat with removal of 900 linear ft. of riprap from along the Suiattle River, placed to protect Road 25. Since the road is closed at this location and proposed for decommissioning, there is no longer need for riprap protection
Project Summary
Location Summary:
Suiattle River drainage, east of Circle Creek
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 03/08/2011 |
| Comment Period | 05/2013 (Estimated) |
| Decision | 07/2013 (Estimated) |
| Implementation | 08/2013 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Categorical Exclusion:
32.2 (7), 36 Cfr 220.6(E)(7)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Darrington Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Wildlife, Fish, Rare Plants
Project Activity:
Species Habitat Improvements
Current Status:
Cancelled
Forests:
Mt Baker-Snoqualmie National Forest
Districts:
Darrington Ranger District
States:
Washington
Counties:
Snohomish
Legal Land Description:
T32N R11E Section 24
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Philip Eidenberg-Noppe
1405 Emens Avenue North
Darrington, WA 98241
360-436-2324
peidenbergnoppe@fs.fed.us
Last Updated: 5/16/2013