Skip to main content

Forest Road 6122 Culvert and Stockpile Project

Install two relief culverts above existing culverts within the prism of Forest Road 6122. Remove up to 6,100 cubic yards of excess road fill material from the two culvert crossings and pile the material in an existing clearing adjacent to the road.

Project Summary

Last Updated: 4/24/2014