Skip to main content

Pratt Bar Trail Construction

Provide safe access to the Pratt Bar, by converting 1,100 ft. of closed non-system road to a USFS system trail. A 35-40 foot bridge would be constructed over a creek and a toilet and trailhead sign would be installed in the existing parking lot.

Project Summary

Last Updated: 7/31/2013