Stream Gauge Equipment
Issue a 20-year permit for the Upper Skagit Tribe to install and maintain gauging equipment on Skagit River tributary stream systems of Tenas Creek and Diobsud Creek.
Project Summary
Location Summary:
Skagit River tributary stream systems of the Mt. Baker and Darrington Districts on an existing bridge structure at Tenas Creek, and bolted to a rock within the stream corridor at Diobsud Creek.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 03/18/2016 |
| Decision | 04/2016 (Estimated) |
| Implementation | 04/2016 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Darrington Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Installation of Stream Gauge Equipment on Diobsud and Tenas Creeks
Decision Signed Date: 04/18/2016
Forests:
Mt Baker-Snoqualmie National Forest
Districts:
Darrington Ranger District
States:
Washington
Counties:
Skagit
Legal Land Description:
T33N, R11E, Section 19 (Tenas Creek) and T36N, R11E, Section 30 (Diobsud Creek).
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Christopher Stewart
1405 Emens Avenue North
Darrington, WA 98241
360-856-2634
csstewart@fs.fed.us
Last Updated: 7/19/2019