Skip to main content

Wells Creek Road (FSR 33) Repair at Mile Post 4.0

A concrete culvert (3 ft diameter) would be removed and a larger corrugated metal pipe (CMP) culvert (5 ft diameter) would be installed, upgrading the crossing to add capacity for flows and debris.

Project Summary

Last Updated: 7/20/2017