Wells Creek Road (FSR 33) Repair at Mile Post 4.0
A concrete culvert (3 ft diameter) would be removed and a larger corrugated metal pipe (CMP) culvert (5 ft diameter) would be installed, upgrading the crossing to add capacity for flows and debris.
Project Summary
Location Summary:
This project is located at MP 4.0 on FSR 33, Wells Creek Rd, in Whatcom County. The project area is approximately eight miles east southeast of Glacier, WA
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 02/01/2017 |
Decision | 07/2017 (Estimated) |
Implementation | 08/2017 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (18), 36 Cfr 220.6(E)(18)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Mt Baker Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Road Management
Project Activity:
Road Maintenance
Current Status:
Completed
Project Decision Information
Wells Creek Road (FSR 33) Repair at Mile Post 4.0
Decision Signed Date: 07/07/2017
Forests:
Mt Baker-Snoqualmie National Forest
Districts:
Mt Baker Ranger District
States:
Washington
Counties:
Whatcom
Legal Land Description:
T39N; R8E; Sec. 9
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Santino Pascua
810 State Route 20
Sedro-Woolley, WA 98294
425-888-1421
comments-pacificnorthwest-mtbaker-snoqualmie-mtbaker@fs.fed.us
Last Updated: 7/20/2017