Skip to main content

Straight Creek and All Creek: Aquatic Organism Passage

Would replace two existing culverts, re-grade streambed, install culvert structure that fits aquatic organism needs, and re-establish road segment including erosion control measures. Actions included in prior NEPA analysis (2012 Suiattle ATM).

Project Summary

Last Updated: 12/19/2017