US 2/Stevens Pass Avalanche Deflection Berm
WSDOT proposes construction of an avalanche berm that will deflect avalanche debris from entering US 2. A 2.5-3 acre area on the avalanche slope will be excavated and shaped into an earthen berm.
Project Summary
Location Summary:
East of US 2 (MP 60.40-60.50) Stevens Pass area, and north of Alpine Lakes Wilderness. Tunnel Creek drainage of the Upper Tye River watershed
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 05/11/2018 |
Decision | 10/2018 (Estimated) |
Implementation | 07/2019 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Skykomish Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
US 2/Stevens Pass Avalanche Deflection Berm
Decision Signed Date: 10/24/2018
Forests:
Mt Baker-Snoqualmie National Forest
Districts:
Skykomish Ranger District
States:
Washington
Counties:
King
Legal Land Description:
T 26 N, R 13 E, Sec 27
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Brian Lee
74920 NE Stevens Pass Hwy
Skykomish, WA 98288
425-888-8795
comments-pacificnorthwest-mtbaker-snoqualmie-skykomish@fs.fed.us
Last Updated: 10/30/2018