Clackamas County Waterline Installation
Clackamas County is proposing to bury a 12-inch diameter waterline in Government Camp, approximately 1,300 feet from Tyrolean Drive west to the access road for the Government Camp Sewage Treatment Plant, and for a fire hydrant at Skibowl West.
Project Summary
Location Summary:
1,300 feet from Tyrolean Drive west to the Government Camp Sewage Treatment Plant. The first 500 feet will be in the south shoulder of US Highway 26 and then cross Skibowl west parking lot.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 09/10/2014 |
| Decision | 03/2015 (Estimated) |
| Implementation | 03/2015 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.12 (8), 36 Cfr 220.6(D)(8)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Zigzag Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Clackamas County Waterline Extension at Government Camp
Decision Signed Date: 03/10/2015
Forests:
Mt. Hood National Forest
Districts:
Zigzag Ranger District
States:
Oregon
Counties:
Clackamas
Legal Land Description:
T 3 S, R 8 E, Sec 24, WM
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Leanne Veldhuis
70220 E. Highway 26
Zigzag, OR 97049
503-622-2030
lveldhuis@fs.fed.us
Last Updated: 3/16/2015