Special Uses Projects 2020 for Ski Area Improvements, and Building and Vault Toilet Construction
Ski run widening, waterline installation, conveyor system construction, building improvements, a dormitory building reconstruction, construction of four vault toilets, and the relocation of a shed.
Project Summary
Location Summary:
Projects are located within the permit areas of Mt. Hood Meadows Oreg. LLC, Teacup Lake Nordic Club, Cascadia Center for Arts and Crafts, and Mt. Hood Kiwanis Club.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 04/24/2020 |
| Decision | 06/2020 (Estimated) |
| Implementation | 07/2020 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Mt. Hood National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Special Uses Projects 2020: Waterline, Conveyors, Deck, Shed, Vault Toilets
Decision Signed Date: 06/12/2020
Forests:
Mt. Hood National Forest
Districts:
Hood River Ranger District; Zigzag Ranger District
States:
Oregon
Counties:
Clackamas
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Nathan Fletcher
16400 Champion Way
Sandy, OR 97055
503-668-1640
nathanfletcher@fs.fed.us
Last Updated: 6/12/2020