Trail Bridge Blowdown Salvage
Salvage approximately 17 acres of wind throw timber downed during winter storms. The proposal would salvage about 200 mbf of saw logs and reduce fuel buildup. Trees with roots attached would be used as fish habitat.
Project Summary
Location Summary:
Upper McKenzie River Watershed, east of Trail Bridge Reservoir along Forest Road 2600612.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 09/10/2007 |
Comment Period | 12/05/2007 |
Decision | 01/2008 (Estimated) |
Implementation | 03/2008 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (13), 36 Cfr 220.6(E)(13)
Special Authority:
Not Applicable / Other
Lead Management Unit:
McKenzie River Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Fuels Management; Wildlife, Fish, Rare Plants; Forest Products
Project Activity:
Fuel Treatments (Non-Activity Fuels); Timber Sales (Salvage); Watershed Improvements
Current Status:
Completed
Project Decision Information
Trail Bridge Blowdown Salvage Project
Decision Signed Date: 01/10/2008
Legal Notice Date: 01/15/2008
Forests:
Willamette National Forest
Districts:
McKenzie River Ranger District
States:
Oregon
Counties:
Linn
Legal Land Description:
T.15S, R.6E, Sec. 1; W.M.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Shadie Nimer
57600 McKenzie Hwy
McKenzie Bridge, OR 97413
541-822-7271
snimer@fs.fed.us
Last Updated: 3/14/2008