Skip to main content

Olallie Reroute

This scoping initiates a project to reroute a 1/2 mile of the Olallie trail. This work would require removing trees <12 inches from the 96 inch wide trail prism and ground disturbance 22' wide to build the tread.

Project Summary

Last Updated: 3/14/2014