House Rock Bridge Replacement
The trail foot bridge at House Rock campground will be replaced with a pre-engineered steel bridge. Concrete abuttments would be required on either side of the South Santiam River.
Project Summary
Location Summary:
South Santiam Watershed
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 01/11/2013 |
Comment Period | 03/25/2013 |
Decision | 06/2013 (Estimated) |
Implementation | 08/2013 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.12 (4), 36 Cfr 220.6(D)(4)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Detroit Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Recreation Management
Project Activity:
Trail Management
Current Status:
Completed
Project Decision Information
House Rock Bridge Replacement
Decision Signed Date: 06/10/2013
Legal Notice Date: 06/17/2013
Forests:
Willamette National Forest
Districts:
Sweet Home Ranger District
States:
Oregon
Counties:
Linn
Legal Land Description:
T13S, R5E, Section 32
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Bradford Peterson
HC73, Box 320
Mil City, OR 97360
503-854-3894
bcpeterson@fs.fed.us
Last Updated: 6/18/2013